Kodigehalli metro station

Upcoming Namma Metro station under Blue Line

13°03′25″N 77°35′38″E / 13.05702°N 77.59386°E / 13.05702; 77.59386Owned byBangalore Metro Rail Corporation Ltd (BMRCL)Operated byNamma MetroLine(s)Blue LinePlatformsIsland platform (TBC)
Platform-1 → Krishnarajapura / Central Silk Board
Platform-2 → KIAL Terminals
Platform Numbers (TBC)Tracks2 (TBC)ConstructionStructure typeElevated, Double trackPlatform levels2 (TBC)Parking(TBC)Accessible(TBC)Other informationStatusUnder ConstructionStation code(TBC)HistoryOpeningJune 2026; 21 months' time (June 2026) (TBC)Electrified(TBC)Services
Preceding station Namma Metro Following station
Hebbal
towards Krishnarajapura or Central Silk Board
Blue Line
(Future Service)
Jakkur Cross
Route map
Legend
Central Silk Board
Yellow Line
Under Construction
HSR Layout
Agara
Ibbaluru
Bellandur
Kadubeesanahalli
Kodibeesanahalli
Marathahalli
ISRO
Doddanekundi
DRDO Sports Complex
Sarasvathi Nagar
Krishnarajapura Krishnarajapuram railway station
Purple Line
Mainline rail interchange Baiyappanahalli Depot (U/C)
Kasturi Nagar
Horamavu
HRBR Layout
Kalyan Nagar
HBR Layout
Nagawara
Pink Line
Under Construction
Veerannapalya
Kempapura
Orange Line
Planned
Hebbal Hebbal railway station
Kodigehalli
Jakkur Cross
Jakkur Plantation (No Scope)
Yelahanka
Bagalur Cross
Bettahalasuru (No Scope)
Chikkajala
Doddajala
Mainline rail interchange Doddajala Depot (U/C)
(At-Grade)
Airport City
(Underground)
KIAL Terminals
Location
Map

Kodigehalli is an upcoming important elevated metro station on the North-South corridor of the Blue Line[1] of Namma Metro in Bangalore, India. This metro station will mainly serve the Brigade Corporate Offices, consisting of Magnum, Opus, Triumph and Caladium. It also serves prime locations including Aster CMI Hospital, Amruthahalli Lake Park, Godrej Woodsman Estate, RMZ Latitude and many restaurants for the general public. This metro station is slated to be operational around June 2026.[2][3][4][5]

Station layout

Station Layout - To Be Confirmed

Kodigehalli track layout
Legend
P#
P#
to Hebbal **
Station with two tracks and one Island platform
** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Ticket/token, shops
L2 Platform #
Southbound
Towards → Krishnarajapura / Central Silk Board
Next Station: Hebbal
Island platform | Doors will open on the right Disabled access
Platform #
Northbound
Towards ← KIAL Terminals
Next Station: Jakkur Cross

Connections

Entry/Exit

See also

Portals:
  • icon Bangalore
  • icon Trains
  • icon Transport
  • icon Engineering

References

  1. ^ "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  2. ^ "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
  3. ^ "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
  4. ^ "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
  5. ^ "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. Retrieved 14 December 2023.
  • BMRCL English - BMRCL Official Website
  • UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.