Manjunathanagara metro station

Upcoming Namma Metro station under Green Line

13°03′01″N 77°29′40″E / 13.05022°N 77.49444°E / 13.05022; 77.49444Owned byBangalore Metro Rail Corporation Ltd (BMRCL)Operated byNamma MetroLine(s)Green LinePlatformsSide platform
Platform-1 → Madavara
Platform-2 → Silk InstituteTracks2ConstructionStructure typeElevated, Double trackPlatform levels2Parking(TBC)Accessible(TBC)Other informationStatusFinal Stages before OperationsStation code(TBC)HistoryOpeningOctober 2024; 31 days' time (October 2024)Electrified750 V DC third railServices
Preceding station Namma Metro Following station
Chikkabidarakallu
towards Madavara
Green Line
(extension by October 2024)
Nagasandra
Route map
Legend
Madavara
Chikkabidarakallu
Manjunathanagara
Nagasandra
Dasarahalli
Jalahalli
Bus interchange Basaveshwara
Mainline rail interchange Peenya Depot
Peenya Industry
Peenya
Goraguntepalya
Orange Line
Planned
Yeshwanthpur
Yesvantpur Junction railway station
Sandal Soap Factory
Bus interchange Yeshwanthpura TTMC
Mahalakshmi
Parking
Rajajinagar
Mahakavi Kuvempu Road
Srirampura
Mantri Square Sampige Road
Nadaprabhu Kempegowda Stn., Majestic Kempegowda Bus Station Bangalore City railway station
Purple Line
Chickpet
Krishna Rajendra Market
National College
Lalbagh
South End Circle
Jayanagar
Parking Bus interchange Jayanagara TTMC
Rashtreeya Vidyalaya Road
Yellow Line
Under Construction
Banashankari
Bus interchange Banashankari TTMC
Jaya Prakash Nagar
Orange Line
Planned
Yelachenahalli
Konanakunte Cross
Doddakallasandra
Vajarahalli
Thalaghattapura
Silk Institute
Location
Map

Manjunatha Nagar is an upcoming elevated metro station on the North-South corridor of the Green Line of Namma Metro in Bangalore, India. Around this metro station holds the main Bengaluru-Nelamangala Expressway (NH-75) leading towards the city of Nelamangala in Karnataka.

As per latest updates, the Madavara - Nagasandra stretch trial run was conducted on August 6 2024 and with successful trial run, this metro station is slated to be operational around end of September 2024 or beginning of October 2024.[1][2]

Station layout

Station Layout (TBC)

Manjunath Nagar track layout (TBC)
Legend
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Silk Institute
Next Station: Nagasandra
Platform 1
Northbound
Towards ← Madavara
Next Station: Chikkabidarakallu
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

See also

Portals:
  • icon Bangalore
  • icon Transport
  • icon Engineering

References

  1. ^ Sridhar Vivan (5 August 2024). "Green line trial runs kick off in August". Bangalore Mirror. Retrieved 7 August 2024.
  2. ^ Ghoshal, Sudeshna (6 August 2024). "Bengaluru metro update: New trains on Green line for THESE stations in Bangalore; trial run today". Mint. Retrieved 7 August 2024.
Wikimedia Commons has media related to Namma Metro.
Wikivoyage has a travel guide for Bangalore.
  • Bangalore Metro Rail Corporation Ltd. (Official site)
  • UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.
  • v
  • t
  • e
Namma Metro
Green Line 2
Operational
Under
Construction
Depot(s)
  • Peenya
See also
*Stations in italics are Under Construction