Raichur railway station

Train station in Karnataka, India

16°11′37″N 77°20′22″E / 16.1935°N 77.3394°E / 16.1935; 77.3394Elevation406 metres (1,332 ft)Owned byIndian RailwaysOperated bySouth Central RailwayLine(s)Solapur-Guntakal Section
Gadwal–Raichur line
Mahabubnagar-Munirabad linePlatforms3Tracks5ConnectionsBengaluru, Mumbai, Delhi, Chennai, Tirupati, Hyderabad, Pune, Solapur, Mysore, Varanasi, Gorakhpur, Vasco da Gama, Ahmedabad, Jaipur, Rajkot, Coimbatore, Kanniyakumari, Hubbli, Belagavi, Kalaburgi, Jammu Tawi, HassanConstructionStructure typeStandard on groundParkingAvailableAccessibleYesOther informationStatusFunctioningStation codeRC Zone(s) South Central Railway zone Division(s) GuntakalHistoryOpened1871ElectrifiedYes
Location
Raichur Junction is located in Karnataka
Raichur Junction
Raichur Junction
Location in Karnataka
Show map of Karnataka
Raichur Junction is located in India
Raichur Junction
Raichur Junction
Location in India
Show map of India

Raichur Junction railway station, also known as Raichuru Junction railway station (station code:RC[1]), is located in Raichur district in the Indian state of Karnataka and serves Raichur and the surrounding industrially efflorescent area. The station has three platforms.

History

Raichur was the meeting point of two great railway systems of yesteryears – the Great Indian Peninsula Railway and Madras Railway. While the former started construction from Mumbai, the latter from Chennai. The two systems met at Raichur in 1871.[2][3]

The 58 km long Raichur–Gadwal railway track was opened in 2013. Gadwal is on the Dhone–Kacheguda line.[4]

It is the fourth busiest railway station in Karnataka after Bangalore City Junction, Yesvantpur Junction and Hubbali Junction.

New line is constructing from Ginegera (Koppala district) to Mahaboob Nagar via Gangavathi, Sindhanoor, Manvi and Raichur. First phase Ginigera to Raichur estimated to complete in 2022. Completion of this line will make Raichur a large junction with access to Goa, coastal central and southern Karnataka. The distance between Hyderabad and Mangalore will reduce drastically.

Classification

Raichur is classified as an A–category station in the Guntakal railway division.[5]

Electrification

Electrification work in the 641 km Pune–Wadi–Guntakal sector have been completed from Guntakal Junction to Kalaburgi Junction (GULBARGA) and other part of the project getting electrified.[6]

References

  1. ^ "Distances in kilometers between stations on the Guntakal Jn.–Raichur section" (PDF). Indian Railways. 12 September 2009. p. 88. Archived from the original (PDF) on 14 April 2017. Retrieved 1 May 2019.
  2. ^ Chronology of railways in India, Part 2 (1870–1899). "IR History: Early Days – II". IRFCA. Retrieved 3 December 2013.{{cite web}}: CS1 maint: numeric names: authors list (link)
  3. ^ John Hurd, Ian J. Kerr, India's Railway History: A Research Handbook, page 177
  4. ^ "Gadwal-Raichur rail line opening". The New Indian Express. 12 October 2013. Archived from the original on 23 October 2013. Retrieved 9 December 2013.
  5. ^ "Category of Stations over Guntakal Division". South Central Railway zone. Portal of Indian Railways. Archived from the original on 15 March 2016. Retrieved 22 February 2016.
  6. ^ "Brief on Railway Electrification". Electrification Work in Progress. Central Organisation for Railway Electrification. Retrieved 9 December 2013.

External links

Wikimedia Commons has media related to Raichur railway station.
  • Trains at Raichur
Preceding station Indian Railways Following station
Yermaras
towards ?
South Central Railway zone Marichethal
towards ?
  • v
  • t
  • e
Railway stations in Karnataka
SWRTooltip South Western Railway zone
Bangalore
Hubli
Mysore
SCRTooltip South Central Railway zone
Secunderabad
Guntakal
SRTooltip Southern Railway zone
Palakkad
CRTooltip Central Railway zone
Solapur
KRTooltip Konkan Railway zone
Karwar
Namma
Metro
Operational
Under
Construction
Proposed