Redmond Central Connector
Redmond Central Connector | |
---|---|
Redmond Central Connector Park | |
Length | 3.9 mi (6.3 km) |
Location | Redmond, Washington, US |
Use | Hiking and biking |
Website | www |
The Redmond Central Connector is a 3.9-mile (6.3 km) paved rail trail and linear park in Redmond, Washington.[1] It is a spur of the Eastside Rail Corridor, connecting the main Eastrail to downtown Redmond. The trail features art made from railroad tracks and signals.[2][3]
History
The land for the trail was acquired in 2010.[4] Construction proceeded in three phases, beginning in 2013, 2017, and 2022 respectively. The final phase will break ground in 2024, connecting the Central Connector to the Cross Kirkland Corridor.[5]
Route
The trail begins western end of the Puget Power Trail near Overlake Christian Church and Digipen Institute of Technology.[6] A future extension will connect it to the Cross Kirkland Corridor and the rest of the Eastrail. The trail continues southeast before crossing the Sammammish River on a renovated railroad trestle. After crossing the river, it intersects the Sammamish River Trail. The trail then continues into downtown Redmond, passing through Redmond Central Connector Park and Downtown Park.[5] It passes Redmond Town Center before arriving at the future Downtown Redmond station and ending at the Bear Creek Trail. A future Sound Transit bridge across Bear Creek and under Washington State Route 520 will connect it to the East Lake Sammamish Trail, a continuation of the rail trail.[7][8]
References
- ^ "REDMOND CENTRAL CONNECTOR More than a trail" (PDF). Washington State Transportation Commission.
- ^ "Redmond Central Connector Trail" (PDF). Washington Chapter of the American Society of Landscape Architects.
- ^ "Redmond Central Connector Park". Redmond Central Connector Park. City of Redmond.
- ^ "Redmond Central Connector moves closer to reality". Redmond Reporter.
- ^ a b "Redmond Central Connector Trail". City of Redmond.
- ^ "Redmond Central Connector 2 Trail Opens". Go Redmond.
- ^ "Work ramps up on Downtown Redmond Link Extension". Sound Transit.
- ^ "Redmond Central Connector Trail". Washington Trails Association.
- v
- t
- e
- Burke-Gilman Trail
- Cedar River Trail
- Cedar to Green River Trail
- Cross Kirkland Corridor
- East Lake Sammamish Trail
- Redmond Central Connector
- Eastside Rail Corridor
- Interurban Trail (King County)
- Issaquah-Preston Trail
- Preston-Snoqualmie Trail
- Sammamish River Trail
- Snoqualmie Valley Regional Trail
- Centennial Trail
- Interurban Trail (Snohomish County)
- Whitehorse Trail
- Interurban Trail
- Bill Chipman Palouse Trail (Whitman/Latah, Idaho)
- Columbia Plateau Trail (Adams/Franklin/Lincoln/Spokane/Whitman)
- Iron Horse Trail/Palouse to Cascades State Park Trail (King/Kittitas)
- Olympic Discovery Trail (Clallam/Jefferson)
- Seattle and North Coast Railroad (Clallam/Jefferson)
- Willapa Hills Trail (Lewis/Pacific)