The Sistema Interconectado del Norte Grande (Spanish for Interconnected System of Norte Grande) or SING is an alternating current power grid serving the Norte Grande zone of Chile, it produces 19% of the national power generation. The SING covers the three northernmost regions of Chile including Arica y Parinacota, Tarapacá and Antofagasta Region.
As of December, 2011, it had a total installed capacity of 4,550 MW (gross) [1]
References
- ^ SING installed capacity. Central Energía. Retrieved: 15-05-2012
External links
- Global Energy Network Institute
- Centro de Despacho Económico de Carga del Sistema Interconectado del Norte Grande (CDEC-SING) - Economic Load Dispatch Center of the Big North Interconnected System
- v
- t
- e
Energy in Chile
- Celulosa Arauco y Constitución
- Colbún S.A.
- Compañia General de Eletrecidad
- Copec
- Endesa
- Geotérmia del Pacífico
- Geotérmica del Norte
- Sistema Eléctrico de Aysén
- Sistema Eléctrico de Magallanes
- Sistema Interconectado Central
- Blackouts: March 2010
- September 2011
- Sistema Interconectado del Norte Grande
Geothermal |
| ||||||||
---|---|---|---|---|---|---|---|---|---|
Hydroelectric |
| ||||||||
Wind farms | |||||||||
Thermal |
|
Category:Energy in Chile
This Chile-related article is a stub. You can help Wikipedia by expanding it. |
- v
- t
- e