Stateline Wind Farm

46°02′13.98″N 118°48′23.74″W / 46.0372167°N 118.8065944°W / 46.0372167; -118.8065944StatusOperationalConstruction began2001Commission date2001 (Stateline 1)
2002 (Stateline 2)
2009 (Stateline 3)Owner(s)Florida Power & LightWind farm Hub height164 and 207 feet (50 and 63 m)Power generation Units operational456 x 660 kWMake and modelVestas Wind SystemsNameplate capacity222 MW
307 MW (Planned)
[edit on Wikidata]

The Stateline Wind Farm is a wind farm located on Vansycle Ridge, which receives 16 to 18 mph (26 – 29 km/h) average wind speeds from the Columbia Gorge, on the border between Washington and Oregon in the United States. With 454 turbines,[1] it is the largest wind project in the Northwestern United States.[2][3] Costing $300 million to build, it began operation in 2001.[4]

The project employs 660 kW capacity Vestas wind turbines, which collectively will produce a maximum electrical output of 306.9 MW.[1] On average, the project is expected to produce 30 to 35 percent of that capacity year-round. Turbines are controlled individually by electronic systems which direct them into the wind and adjust the pitch of the blades to maximize electrical production at any wind speed from 7 to 56 mph (11.3 to 90 km/h). The turbines automatically shut down at wind speeds excess of 56 mph (90 km/h), a feature which allows them to withstand hurricane-force winds.[4]

The wind turbines are grouped in strings of 5 to 37 turbines, each turbine spaced approximately 250 feet (76 m) from the next, generally slightly downwind of the crest of ridges. Each turbine tower is 166 feet (50 m) tall, with blades 76 feet (23 m) wide.[5]

Environmental impact studies determined that the site was not used extensively by birds or other species vulnerable to injury from turbines, and the turbine towers' construction, along with the use of underground power lines, was designed to minimize perching places for birds.[4] The area around the project is used primarily for private farming, including dryland wheat farming and cattle grazing.[3]

The Stateline Wind Project is several miles northwest of the Vansycle Wind Project in Umatilla County, Oregon. Both are owned and operated by Florida Power & Light, a division of NextEra Energy.

A wind turbine collapsed over the weekend of November 2, 2013 on the Washington side of the Stateline Wind Project.[6]

See also

  • flagOregon portal
  • iconWeather portal
  • iconRenewable energy portal

References

  1. ^ a b "Stateline Wind Project". Oregon Department of Energy. Retrieved 2006-05-15.
  2. ^ Brown, Lester R.; Janet Larsen; Bernie Fischlowitz-Roberts (2002). The Earth Policy Reader. W. W. Norton & Company. ISBN 0-393-32406-0.
  3. ^ a b "Stateline Wind Project". 3Phases Energy Services. Retrieved 2006-05-15.
  4. ^ a b c "Stateline Wind Energy Center". Renewable Northwest Project. Archived from the original on 2006-04-27. Retrieved 2006-05-15.
  5. ^ "Stateline Wind Project". Bonneville Environmental Foundation. Retrieved 2006-05-15.
  6. ^ "Wind turbine collapses in Walla Walla County". The Oregonian. Retrieved 2013-12-10.
  • Renewable Northwest Project site.
  • Oregon government site.
  • v
  • t
  • e
Wind power by state
Large wind farms
Offshore wind farms
Wind power companies
  • icon Wind power portal
  • Category
  • Commons