Stuguflåt Bridge

Bridge in Lesja, Norway
62°17′N 8°08′E / 62.28°N 8.14°E / 62.28; 8.14CarriesRaumabanen railwayCrossesRauma RiverLocaleLesja, NorwayCharacteristicsMaterialStoneTotal length54.1 metres (177 ft)Width10.6 metres (35 ft)Longest span30 metres (98 ft)HistoryConstruction start1919Construction end22 August 1922Construction cost407997 krLocationMap

The Stuguflåt Bridge (Norwegian: Stuguflåtbrua or Stuguflåten bru) is a stone railway bridge north of Stuguflåten on the Rauma Line over the Rauma River in Innlandet county, Norway. The bridge is 54.1 meters (177 ft) long, has a 30-meter (98 ft) span, and is 10.6 meters (35 ft) wide.

Work began on the bridge in 1919, and the foundations were laid in autumn 1920, with the walls started by summer 1921. The first rails were laid on 16 September 1921 and were finished on 22 August 1922. The first train crossed in autumn 1922 and materials from this cargo were used to make a permanent snowplough. The Stuguflåt Bridge has been used year round since 1923, and the total cost of the bridge was 407,997 kr.

In January 1945, Joachim Rønneberg and SOE agents (Operation Fieldfare) tried to damage the bridge in order to halt the movement by German occupying forces on the Rauma Line. The bridge was reopened three weeks later.[1]

See also

References

  1. ^ Årbok for Sunnmøre Historielag 2005 Archived 2014-02-05 at the Wayback Machine accessed 12.2.12.
  • Raumabanen.net/Anleggstiden – Plans and building of Rauma Line.

62°17′04″N 8°08′18″E / 62.28441°N 8.13825°E / 62.28441; 8.13825